Upgrades and Maintenance
Survey
Maintenance, Upgrades and Service
| Date | Description |
|
2/12/2007 |
Replaced starboard holding tank vent. It was clogged. |
|
|
Replaced non-working battery charger with new Newmar triple output charger |
|
|
Replaced VHF radio with new VHF |
|
|
Fixed throttle control so that forward is faster |
|
|
Pulled out old, charred wiring from previous owner. Unused and left from previous equipment that was removed. |
|
|
Re-ran wiring from shore-power connector to cutoff switch |
|
|
Added weather stripping to port side seat locker. |
|
2/2007 |
Added Harken MKIV, size 1 roller furling. Headstay and two uppers were also replaced. |
|
3/2007 |
Replaced impeller on water pump |
|
March -April, /2007 |
Stripped bottom to previous barrier and gel coat, sanded out blisters. Applied three coats of WestSystem 105/205 epoxy, applied another 3 coats of WestSystem 105/205 with 422 additive. |
|
4/2007 |
Repaired rudder delamination. Removed delaminated areas, filled with thickened Epoxy. |
|
4/2007 |
New 200KHz/50KHz transducers installed by Berkeley Marine Center |
|
4/2007 |
Old transducer removed. Thru-hull patched by Berkely Marine Center. |
|
4/2007 |
Cockpit drain thru-hulls removed. New bronze thru-hulls installed with shut-off valves. Installed by Berkeley Marine Center. |
|
4/2007 |
Two coats of primer applied to bottom with Pettit Hydrocoat Blue, performed by Berkeley Marine Center. |
|
5/28/2007 |
Replaced starboard toe-rail drain. It was leaking due to deterioration of the drain. |
|
|
Old, shorted blower removed. Cause of electrical problems due to shorting without in-line fuse. New blower installed. |
|
|
Installed depth sounder for GPS478 |
|
|
Renamed boat and added vinyl boat letter for Terrapin. |
|
|
Installed electric bilge pump and switch. |
|
|
Installed new FM/CD/Weather Radio with cockpit speakers. |
|
3/2008 |
Added cleats for jack lines |
|
3/2008 |
Pulled teak hand rails. Sanded and applied 5 coats of lacquer |
|
3/2008 |
Drilled out teak hand rail holes oversized, due to leaking found. Filled with epoxy and re-drilled to proper size. Mounted hand rails and sealed holes. |
|
4/2008 |
Replaced holding tank line, it was clogged. Un-clogged holding tank vent. |
|
4/2008 |
Applied teak oil to all exposed teak in cabin, including head and v-berth |
|
4/2008 |
Applied vinyl about 6 inches up from head floor around head to simplify cleaning and prevent water damage to teak. |
|
|
|
|
|
|
|
|
(C) Copyright 2008 All Rights Reserved. All photos taken and owned by Timothy Johnson. Photos may be used with written permission. Email competitech(at)gmail.com.